Audit, engineering and design

Andrey Glukharev
Project Manager SBG
We will conduct equipment diagnostics to identify technical and technological problems in production.

In what situations is an audit needed?
you want to implement new technologies or modernize existing processes
there is a decrease in equipment performance, failures and problems in its operation
there is instability in the qualitative and quantitative indicators of production
it is necessary to ensure continuity of production, optimize costs, reduce losses of energy products
What will you get as a result of the audit?
The result will give you the opportunity to independently solve the identified problems with optimal expenditure of time and money.
You will receive an expert opinion indicating all identified problems and options for solving them, with a “problem-solution” table in descending order of priority, indicating the cost of each stage.
!

We arrive to the site
!
We collect and analyze data
!

We form an expert opinion

Alexandra Matyukhina
SBG Project Engineer
In our experience, a couple of days is usually enough to conduct a comprehensive audit. Depending on the type of task, an audit can take from 1-2 days to a month.