Ceramic membranes. Wimm-Bill-Dann

SBG supplies PALL ceramic membranes for the ultrafiltration of baby curd on a permanent basis. This batch of high quality membranes is intended for our key partner Wimm-Bill-Dann.

If you have a need to purchase PALL membranes, please contact our sales department: info@sbgteam.ru.

InfaPrim. Istra

Exactly one year ago, SBG carried out a number of works to start production at the InfaPrim site in Istra.

The following equipment and systems were installed and commissioned:

  • Distribution-drying plant;
  • Suspended platform for the ready product hopper;
  • Drying equipment grounding systems;
  • Food piping and CIP;
  • Engineering media to drying;
  • Sterile tank;
  • Safety Systems.

SBG team is ready to realize similar projects at our customers’ sites. If you have an inquiry, please contact our commercial department: info@sbgteam.ru

SBG x China

SBG’s technical team is now in China on a tour of Chinese industries. The goal is to expand and diversify suppliers of specialized equipment, components and materials.

Agreements have been reached for the supply of equipment and spare parts for current projects:

  • Milk Sterilizers;
  • Tanks;
  • Vacuum mixers;
  • Pumps, valves, stainless pipes, fittings, etc.

Prospects for further closer cooperation are also being actively discussed.

Production site for kefir starter. Engels

SBG team has successfully completed the full cycle of mechanical and electrical installation of kefir starter production equipment at the Engels site.

Next week, SBG specialists will start commissioning works, which include verification of system operability, testing of technological processes and preparation of the equipment for commissioning. This is an important stage that will ensure stable and uninterrupted operation of production.

Jam boiler

Our team is completing the installation and testing of an 1800 liter jam boiler at a company as part of a large project.

SBG has performed the following works:

  • Design and manufacture of a Russian-built boiler (the boiler is a copy of ZETA);
  • Dismantling of the existing boiler;
  • Installation and mounting of the new boiler in the design position with subsequent piping;
  • Programming;
  • Carrying out dry and wet tests;
  • Conducting a “SPRAY SHADOW” test.

At the moment our team is completing the washing and testing phase of the equipment. The next thing in the queue is to work out on the product.